Skip to main content
Government of Ontario

Road or Trail Construction/Water Crossings Part 4


1. Include a sketch showing

  • Detailed location of road or trail (i.e. how close to waterbodies, etc.)
  • All water crossings

2. Purpose

a. Access to private property
b. Access for resource extraction

(e.g. mining, logging, mineral exploration)

(specify)


3. Type

Type

4. Description


5. Length of Time Required

Long or Short Term

6. Who will be responsible for maintenance?


7. Source Gravel/Fill


8. Water Crossing (letters refer to sample sketch on reverse)

ft/sec or m/sec


8a. Bridge


8b. Culvert