Skip to main content
Government of Ontario

Work Permit Application for Works on Shore Lands for Erosion Control

Public Lands Act, R.S.O.1990

Are you planning to conduct work along a shoreline?
The Ministry of Natural Resources and Forestry (MNRF) reminds landowners that a work permit may be required before working in the water or along your shoreline.

Instructions
Use this form if you intend to construct a new or expand an existing erosion control structure1 on shore lands2 along your waterfront property3. This form may be utilized to apply for work involving filling or dredging of shore lands for erosion control.

1 For the purpose of the work permitting process, an erosion control structure shall be considered as anything that is placed, or constructed in order to protect a shoreline from erosion. Examples of erosion control structures include gabion baskets, armour stone, groynes and retaining walls.
2 Shore lands are lands covered or seasonally inundated by the water of a lake, river, stream or pond.
3 Waterfront property means a parcel of land that has a boundary on a lake, river, stream or pond, or is separated from a lake, river, stream or pond only by, an unopened road allowance, or a strip of public lands that is not more than 30 metres in perpendicular width from the lake, river, stream or pond.

What is a Work Permit?
A work permit is issued under the authority of the Public Lands Act, R.S.O.1990 to authorize activities on public lands and shore lands. Public lands mean any lands under the control and management of the MNRF, including the beds of most lakes and rivers in Ontario. A Work Permit ensures that specific activities on public lands and shore lands have regard for the environment, other users and neighbouring landowners.

Timelines for Work Permit Reviews
The Ministry has a service standard of 21 business days for the review and issuance of work permits for erosion control structures. Note that the Ministry must assess and fulfill the duty to consult with Indigenous communities as well as review some structures for engineering requirements. This may extend review timelines.
If you are in doubt on whether a Work Permit is required; please contact your local ministry work centre.
Please submit this application by mail or email to your local ministry work centre.

Collection of Personal Information
Personal information on this form is collected under the authority of Section 13 of the Public Lands Act, R.S.O.1990 and Ontario Regulation 975 as amended, and the information will be used for the purposes of the Act and Regulations.
Questions about this should be directed your local ministry work centre.

Fields marked with an asterisk (*) are mandatory.


1. Applicant Details

Name of Applicant (Property owner)
Mailing Address of Applicant
Telephone Number
If someone is acting on your behalf (for example a contractor) please complete the section below.

as our agent for the purpose of future correspondence with the Ministry of Natural Resources and Forestry in regard to this application and authorization.

Any correspondence should be forwarded to:
(Unless specified otherwise, all correspondence will be forwarded to the landowner)

Specify time period in which work will occur

In general, in-water work should not take place during fish spawning season or during the time of other critical fish life stages as set out in the In-water Work Timing Window Guidelines, available at:
https://www.ontario.ca/page/water-work-timing-window-guidelines

or


2. Application Description

Please identify type of erosion control being proposed - see examples below

3. Structure location and size (relative to your property)

Please identify the dimensions of the structure you are seeking approvals for. See sketch examples of dimensions below.

Specify measurement unit

Length X Depth


4. Site Location


5. Reference Map and Photos

Your application cannot be processed without including this information

Please attach a photo of shoreline where work is proposed to be undertaken. These will help better process your application.

Please attach a reference map to this application with large extent view of your property and the surrounding area. Standard reference map templates can be accessed using our “make a topographic map” tool online.

https://www.ontario.ca/page/topographic-maps - see map example below

Note: This form and any attachments can not exceed 9MB in size in total.


6. Instructions for Erosion Control Structures Sketch and Project Description

Please attach two sketches (bird's eye view and cross section). Include property lines, shoreland area that is seasonally inundated by water as well as the proposed structure dimensions. Please ensure that you sign and date each sketch submitted with your application. See examples below.

Bird's Eye View and Cross section
For proposed projects involving fill placement (i.e. new erosion control structures, shoreline filling and/or stabilization), the following items must be included

7. Attestations

The construction or placement of the proposed structure complies with the following and I will provide supporting documentation as it relates to the attestations below, should it be requested:

(Please check only one from options a) or b) below) *


8. Signature

  • certify that the information provided in this application is true, correct and complete.
  • confirm that I am of the age of majority;
  • agree that, if any authorization is issued under the Public Lands Act in respect of the subject matter of this application, I will comply with the terms and conditions of such authorization (or, if I am submitting this application on behalf of the corporation, the corporation agrees to comply with the terms and conditions of such authorization); and
  • understand that I am affixing my electronic signature to this application, with the intent to be bound as an applicant (or, if I am submitting this application on behalf of a corporation, I represent that I have the authority to bind the corporation and the corporation agrees to be bound as applicant).